This steel tower project in Port Said was developed for Henkel to enhance operational efficiency and infrastructure capacity. Designed for vertical equipment integration and process optimization, the tower stands as a key element in Henkel’s industrial site, reflecting advanced engineering, streamlined functionality, and adherence to high international construction and safety standards.
The scope involved supply, fabrication, and erection of the steel tower structure, including support frames, working platforms, staircases, and safety features. Constructed under the supervision of ACE Moharram Bakhoum, the tower was delivered with precision to accommodate mechanical systems, ensure operational resilience, and align with Henkel’s technical and structural specifications.